Our primary goals for this project were to assist Byrnecut with the safe and on time/ on budget construction of the 1300 m long Wira ventilation Shaft at Prominent Hill Mine.

Date:
July 17, 2024
Location:
South Australia

What we did 

Raisebore and temporary support design, fibrecrete mix design, permanent liner design for transition zone from presink to permanent liner, provision of site personnel to conduct geotechnical inspections, QA/QC and ground support design during construction (ongoing), design and proof engineering of headframe.

Outcomes

Construction is currently on target. Byrnecut and pitt&sherry are working collaboratively to solve problems on the go with additional resources being utilised and the introduction of new technology. Additional resources from pitt&sherry are being provided to give 24 hour Geotechnical QA/QC coverage. 


Let's connect

Get in touch with our team in Mining & Industrial

Leah Brown
General Manager - Mining & Industrial

Discover the pitt&sherry difference
Come to us with a big problem, and we’ll help you solve it
Get in touch


pitt&sherry acknowledges the Traditional Custodians of the many Countries throughout Australia and their connections to land, sea and community. We acknowledge the contributions and sophistication of Aboriginal and/or Torres Strait Islander knowledge and culture.